<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 3OIL AND GAS DIVISION
RULE §3.46Fluid Injection into Productive Reservoirs

    (D) The commission or its delegate may prescribe a schedule and mail notification to operators to allow for orderly and timely compliance with the requirements in subparagraph (A) and subparagraph (B) of this paragraph. Such testing schedule shall not apply to an injection well for which an injection well permit has been issued but the well has not been drilled or converted to injection.

  (4) Pressure tests.

    (A) Test pressure.

      (i) The test pressure for wells equipped to inject through tubing and packer shall equal the maximum authorized injection pressure or 500 psig, whichever is less, but shall be at least 200 psig.

      (ii) The test pressure for wells that are permitted for injection through casing shall equal the maximum permitted injection pressure or 200 psig, whichever is greater.

    (B) Pressure stabilization. The test pressure shall stabilize within 10% of the test pressure required in subparagraph (A) of this paragraph prior to commencement of the test.

    (C) Pressure differential. A pressure differential of at least 200 psig shall be maintained between the test pressure on the tubing-casing annulus and the tubing pressure.

    (D) Test duration. A pressure test shall be conducted for a duration of 30 minutes when the test medium is liquid or for 60 minutes when the test medium is air or gas.

    (E) Pressure recorder. Except for tests witnessed by a commission representative or wells permitted for injection through casing, a pressure recorder shall be used to monitor and record the tubing-casing annulus pressure during the test. The recorder clock shall not exceed 24 hours. The recorder scale shall be set so that the test pressure is 30 to 70% of full scale, unless otherwise authorized by the commission or its delegate.

    (F) Test fluid.

      (i) The tubing-casing annulus fluid used in a pressure test shall be liquid for wells that inject liquid unless the commission or its delegate authorizes use of a different test fluid for good cause.

      (ii) The tubing-casing annulus fluid used in a pressure test shall contain no additives that may affect the sensitivity or otherwise reduce the effectiveness of the test.

    (G) Pressure test results. The commission or its delegate will consider, in evaluating the results of a test, the level of pollution risk that loss of well integrity would cause. Factors that may be taken into account in assessing pollution risk include injection pressure, frequency of testing and monitoring, and whether there is sufficient surface casing to cover all zones containing usable-quality water. A pressure test may be rejected by the commission or its delegate after consideration of the following factors:

      (i) the degree of pressure change during the test, if any;

      (ii) the level of risk to usable-quality water if mechanical integrity of the well is lost; and

      (iii) whether circumstances surrounding the administration of the test make the test inconclusive.

  (5) Alternative testing methods.

    (A) As an alternative to the testing required in paragraph (2) of this subsection, the tubing-casing annulus pressure may be monitored and included on the annual monitoring report required by subsection (i) of this section, with the authorization of the commission or its delegate and provided that there is no indication of problems with the well. Wells that are approved for tubing-casing annulus monitoring under this paragraph shall be tested in the manner provided under paragraph (3) of this subsection at least once every ten years after January 1, 1990.

    (B) The commission or its delegate grant an exception for viable alternative tests or surveys or may require alternative tests or surveys as a permit condition.

  (6) The operator shall notify the appropriate district office at least 48 hours prior to the testing. Testing shall not commence before the end of the 48-hour period unless authorized by the district office.

  (7) A complete record of all tests shall be filed in duplicate in the district office within 30 days after the testing.

  (8) In the case of permits issued under this section prior to the effective date of this amendment which require pressure testing more frequently than once every five years, the commission's delegate may, by letter of authorization, reduce the required frequency of pressure tests, provided that such tests are required at least once every three years. The commission shall consider the permit to have been amended to require pressure tests at the frequency specified in the letter of authorization.

(k) Area Permits. A person may apply for an area permit that authorizes injection into new or converted wells located within the area specified in the area permit. For purposes of this subsection, the term "permit area" shall mean the area covered or proposed to be covered by an area permit. Except as specifically provided in this subsection, the provisions of subsections (a) - (j) of this section shall apply in the case of an area permit and all injection wells converted, completed, operated, or maintained in accordance with that permit. Except as otherwise specified in the area permit, once an area permit has been issued, the operator may apply to operate individual wells within the permit area as injection wells as specified in paragraph (3) of this subsection.

  (1) An application for an area permit must be accompanied by an application for at least one injection well. The applicant must:

    (A) identify the maximum number of injection wells that will be operated within the permit area;

    (B) identify the depth(s) of usable-quality water within the permit area, as determined by the Groundwater Advisory Unit of the Oil and Gas Division;

    (C) for each existing well in the permit area that may be converted to injection under the area permit, provide a wellbore diagram that specifies the casing and liner sizes and depths, packer setting depth, types and volumes of cement, and the cement tops for the well. A single wellbore diagram may be submitted for multiple wells that have the same configuration, provided that each well with that type of configuration is identified on the wellbore diagram and the diagram identifies the deepest cement top for each string of casing among all the wells covered by that diagram.

    (D) provide a wellbore diagram(s) showing the type(s) of completion(s) that will be used for injection wells drilled after the date the application for the area permit is filed, including casing and liner sizes and depths and a statement indicating that such wells will be cemented in accordance with the cementing requirements of §3.13 of this title (relating to Casing, Cementing, Drilling, and Completion Requirements) (Statewide Rule 13);

    (E) identify the type or types of fluids that are proposed to be injected into any well within the permit area;

    (F) identify the depths from top to bottom of the injection interval throughout the permit area;

    (G) specify the maximum surface injection pressure for any well in the permit area covered by the area permit;

    (H) specify the maximum amount of fluid that will be injected daily into any individual well within the permit area as well as the maximum cumulative amount of fluid that will be injected daily in the permit area;

    (I) in lieu of the area-of-review required under subsection (e) of this section and subject to the area-of-review variance provisions of subsection (e) of this section, review the data of public record for wells that penetrate the proposed injection interval within the permit area and the area 1/4 mile beyond the outer boundary of the permit area to determine if all abandoned wells have been plugged in a manner that will prevent the movement of fluids from the injection interval into freshwater strata. The applicant shall identify in the application the wells which appear from the review of such public records to be unplugged or improperly plugged and any other unplugged or improperly plugged wells of which the applicant has knowledge. The applicant shall also identify in the application the date of plugging of each abandoned well within the permit area and the area 1/4 mile beyond the outer boundary of the permit area; and

    (J) furnish a map showing the location of each existing well that may be converted to injection under the area permit and the location of each well that the operator intends, at the time of application, to drill within the permit area for use for injection. The map shall be keyed to identify the configuration of all such wells as described in subparagraphs (C) and (D) of this paragraph.

Cont'd...