<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 3OIL AND GAS DIVISION
RULE §3.86Horizontal Drainhole Wells

    (B) within 600 feet from any take point on a horizontal well within the UFT field correlative interval.

  (3) Persons who have received notice pursuant to paragraph (2) of this subsection shall have 21 days from the date of issuance of the notice to file a written objection with the Commission.

  (4) If no timely filed written objection is received by the Commission, the applicant provides written waivers from all persons entitled to notice under paragraph (2) of this subsection, or there are no persons entitled to notice, then the application may be approved administratively without the requirement of filing supporting data.

  (5) If a timely filed written objection is received by the Commission, the applicant may request a hearing, at which the applicant shall show that the proposed exception to §3.38 of this title is necessary to effectively drain an area of the UFT field that will not be effectively drained by existing wells or to prevent waste or confiscation. Notice of a hearing for a protested exception application under §3.38 of this title for a well in a UFT field will be provided to those persons entitled to notice of such an application as specified in paragraph (2) of this subsection.

  (6) Permits granted pursuant to paragraphs (1) - (5) of this subsection shall be issued as exceptions to §3.38 of this title.

  (7) Nothing in this subsection prevents an operator from electing to apply for and obtain a density exception under the provisions of §3.38 of this title rather than the provisions of paragraphs (1) - (6) of this subsection.

(l) Tubing requirements for completions in UFT fields. An operator of a flowing oil well in a UFT field may obtain a six-month exception to the requirement in §3.13(b)(4)(A) of this title (relating to Casing, Cementing, Drilling, Well Control, and Completion Requirements) that flowing oil wells shall be produced through tubing. The exception may be granted administratively. A revised completion report shall be filed once the oil well has been equipped with the required tubing string to reflect the actual completion configuration.

  (1) For good cause shown, including a showing that the well is flowing at a pressure in excess of 300 psig surface wellhead flowing pressure, an operator may obtain from the District Director one or more extensions to the six month exception. Each extension shall be no more than six months in duration. If the request for an extension is denied, the operator may request a hearing. If a hearing is requested, the exception shall remain in effect pending final Commission action on the request for an extension.

  (2) This subsection applies to new drills, reworks, recompletions, or new fracture stimulation treatments for any flowing oil well in the field.


Source Note: The provisions of this §3.86 adopted to be effective June 1, 1990, 15 TexReg 2635; amended to be effective July 10, 2000, 25 TexReg 6487; amended to be effective June 11, 2001, 26 TexReg 4088; amended to be effective September 1, 2004, 29 TexReg 8271; amended to be effective February 1, 2016, 41 TexReg 785

Previous Page

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page